The case study below details the refurbishment and modernisation of the turbine installed in 1927 by Gilkes on Balmoral Estate. It shows the longevity of hydropower and the pedigree of companies like Gilkes.
Cromford Mills is part of the Derwent Valley Mill World Heritage Site, and was the first successful water powered cotton spinning mill. The project has waterpower at its heart, delivering…
Read MoreThe Earba Storage project is a proposed pumped storage hydro (‘PSH’) scheme with an installed capacity of up to 1,800MW. The Earba project will be the largest such scheme in…
Read MoreCwm Dyli hydroelectric power station was built in 1906 and is Britain’s oldest power station and the first instance in Britain of the use of alternating current.
Read MoreThe Blair Castle project was a reinstatement of hydropower that had existed in one form or another in the castle since 1908, which had also been installed by Gilkes. With keeping in mind the original powerhouse and design, the easily accessible powerhouse had a new Pelton turbine installed.
Read More