Derwent Hydro: Cromford Mills

Other

Case Studies


Earba Pumped Storage Hydropower


The Earba Storage project is a proposed pumped storage hydro (‘PSH’) scheme with an installed capacity of up to 1,800MW. The Earba project will be the largest such scheme in…

Read More

RWE: Snowdonia Hydro


Cwm Dyli hydroelectric power station was built in 1906 and is Britain’s oldest power station and the first instance in Britain of the use of alternating current.

Read More

Gilkes Hydro: Blair Castle


The Blair Castle project was a reinstatement of hydropower that had existed in one form or another in the castle since 1908, which had also been installed by Gilkes. With keeping in mind the original powerhouse and design, the easily accessible powerhouse had a new Pelton turbine installed.

Read More

Gilkes Hydro: Balmoral Castle


The case study below details the refurbishment and modernisation of the turbine installed in 1927 by Gilkes on Balmoral Estate. It shows the longevity of hydropower and the pedigree of…

Read More

Mailing List


Sign up and stay informed with the latest updates in the hydropower sector.

This field is for validation purposes and should be left unchanged.